Challenge
Client is on a schedule and cannot procure building additions within the outage time frame.
Solution
Monarch met with the client to document what the building needs were and went directly into design-build mode. Engineers worked systematically through the requirements and produced drawings for the fabrication just-in-time scenario. We were able to meet the timeline while giving the client exactly what he needed for the price that he appropriated.